Hafta |
Tarih |
Konu |
Ders Notları |
1 |
28 Şubat |
|
|
2 |
7 Mart |
Introduction to
Stochastic Programming |
http://www.gurobi.com/resources/seminars-and-videos/Solving-Simple-Stochastic-Optimization-Problems |
3 |
14 Mart |
Lecture Materails |
(Book)
(SP Lecture Notes 1)
(SP Lecture Notes 2) |
4 |
21 Mart |
Materials on CVaR |
(CVar Lecture Notes ) |
5 |
28 Mart |
|
http://www.gurobi.com/documentation/7.0/examples/portfolio_py.html |
6 |
4 Nisan |
Portfolio Optimization,
Asset Liability Management |
(2016_SP_PORT_An interactive approach to stochastic)
(2015_ML_PORT_CVAR_Multi-stage stochastic mean–semivariance–CVaR
portfolio optimization under transaction costs)
(2016_CVAR_Enhanced Index Tracking with CVaR-Based Measures)
(2016_CVAR_Scenario-Based Portfolio Optimization) |
7 |
11 Nisan |
Cash Logistics |
(2018_MIP_ROBUST_Improvingcashlogisticsinbankbranches) |
8 |
18 Nisan |
Operating Theatre
Scheduling |
(2011_LIT_Operational research in the management of the operating
theatre)
(2008_LIT_Operating room planning and scheduling) |
9 |
25 Nisan |
Operating Theatre
Scheduling |
(2012_MIP_Long term evaluation of operating theater planning
policies)
(2014_MIP_Analysis of the Integration of the Physician Rostering
Problem and the Surgery Scheduling Problem)
(2014_MIP_Managing daily surgery schedules in a teaching)
(2016_MIP_AMIPModelForRollingHorizonSurg) |
10 |
2 Mayıs |
Operating Theatre
Scheduling |
(2011_SP_Stochastic Operating Room Scheduling)
(2015_SP_A stochastic programming approach for operating theatre
scheduling) |
11 |
9 Mayıs |
Energy Planning |
(Energy Related) |
12 |
16 Mayıs |
Presentations |
|
13 |
23 Mayıs |
Presentations |
|
14 |
30 Mayıs |
Presentations |
|
15 |
13 Haziran |
Final Sınavı |
|